In Sweden this spring, in April, work was started to construct a hospital in Malmo. Litana designed and will manufacture and assemble the metal reinforced concrete structures. It will be the biggest project ever built by Litana Group. Total area of the project will be 101,000 sqm and 8,000 tons of metal will be erected by 5 overhead cranes. According to the director of the project, Vaidas Stankus, this will be a challenge for all of us due to the various technical difficulties involved as the new building will be built among an existing hospital. All work will last 2 years.