In 2018-2019 JSC “Litana ir Ko“ participated in the equipment of SC “Kauno grūdai“ integrated plant which was being built at that time to produce the speady cook food items, and completed the following works:

- the design, production and mounting of stainless steel platforms with the staircases and railings;

- the elimination of constructual malfunctions on paste goods production line;

- the modification of stainless steel structures.

The customer positively assessed our work by stating in the reference letter its satisfaction with the quality of design works, manufacturing and assembly of metal structures, as well as with the competency of employees while performing such works. The high level of planning, work organizing and EHS are also stated in the reference letter.