The month of July was marked by the completion of construction works in buildings By 35 and By 36 of the hospital complex in the Swedish city of Malmö. The hospital complex consists of two 11-storey buildings with a total area of 101,000 sq. meters. For this facility, the specialists of the Litana group of companies performed the works on the design, manufacture and installation of metal and reinforced concrete structures. In total, 8,400 tons of metal structures and 30,000 square meters of precast concrete floor slabs were installed at the facility.